WFM Pro - ability to schedule breaks /lunches after meetings or other work has been added
To have the option that the automatic scheduler can schedule breaks and lunches after the team has inputted any manual meetings/off phone work. MTVH has a lot of off phone work which is manually scheduled in after the shifts have been scheduled. Some manually added work can be scheduled over break - this then overwrites all the breaks/lunches that have be automatically scheduled. The WFM specialist then has to add lunches and breaks back manually at indivdual level - which causes a lot of extra time for me to schedule. It would be a great help if the tool had the option to schedule breaks and lunches automatically - without overwriting any manually added meetings or other work.